Sustainable Development at Demix

Demix Agrégats, Demix Béton and Demix Construction, divisions of CRH Canada Group Inc., are fully committed to CRH Canada's sustainable development, responsible stewardship of the natural environment and social responsibility initiatives.

This section is dedicated to sharing our initiatives that support that commitment. We encourage you to bookmark this section and visit us regularly to learn about our latest activities.

Rapid Bridge Replacement

Dufferin Construction replaced a four-span overpass over Highway 403 in Hamilton using the Rapid Bridge Replacement Technology. While Dufferin Construction has worked on contracts of this nature for the Ministry of Transportation of Ontario before, it was the first multi-span replacement in Canada. In addition, two different rapid bridge replacement technologies were used, one for the two centre lanes of the overpass (self-propelled modular transporters) and another for the two outside lanes (jack and slide). Extensive engineering, planning and preparation were required to successfully fulfill this mandate within a 51-hour timeframe (80 hours had been allocated by the MTO). 

Rapid Bridge Replacement 650x300